Cambridge Earthquake Impact Database
 
Collapse
description
Partial or total collapse of the building
notes
Partial or total collapse of the building. Collapse of large sections of foundations and structures due to heavy scouring. Excessive foundation settlement and tilting beyond repair. Damage to the structure cannot be repaired after the tsunami and must be demolished.

© Cambridge Architectural Research Ltd
25 Gwydir Street #6
Cambridge, CB1 2LG, UK
UK tel: 01223 460475 | fax: 01223 464142 | International tel: +44 1223 460475 | fax: +44 1223 464142 | email: info@carltd.com
Database design and Website by Stride Design Ltd | Web Site Terms and Conditions of Use